- Contact Person : Ms. li Lark
- Company Name : Ningling Lanning Technology Co., Ltd.
- Tel : 86-370-3337890
- Fax : 86-370-3337890
- Address : Henan,shangqiu city,Industry gathering area in ningling
- Country/Region : China
- Zip : 476000
pyrolysis equipment
1 | Equipment type | Ln—2.2 *6 | Ln—2.6*6 | Ln—2.8*6 | Ln –2.8 *6.6 |
2 | Raw material | tires/Plastic/rubber | tires/Plastic/ rubber | tires/Plastic/rubber | tires/Plastic/rubber |
3 | 24-hour Capacity | 6 ton | 8 ton | 10 ton | 12 ton |
4 | Oil yield | 2.7ton | 3.6 ton | 4.5 ton | 5.4 ton |
5 | Operating pressure | Normal | Normal | Normal | Normal |
6 | Marerial of Ractor | Q245R | Q245R | Q245R | Q245R |
7 | Thickness of Ractor | 14mm/16mm | 14mm/16mm | 14mm/16mm | 14mm/16mm |
8 | Rotate speed of Ractor | 0.4turn/minute | 0.4turn/minute | 0.4turn/minute | 0.4turn/minute |
9 | Total power | 10KW | 16KW | 16KW | 16KW |
10 | Mode of cooling | Water cooling | Water cooling | Water cooling | Water cooling |
12 | Driving Mode | Internal gear driving | Internal gear driving | Internal gear driving | Internal gear driving |
13 | Noise dB(A) | ≤85 | ≤85 | ≤85 | ≤85 |
14 | Size of Reactor(D×L) | 2200×6000 | 2600×6000 | 2800×6000 | 2800×6600 |
15 | Working form | Intermittent | Intermittent | Intermittent | Intermittent |
16 | Delivery time | 15-20days | 15-20days | 15-20days | 15-20days |
17 | Weight | 27 T | 32 T | 35 T | 37 T |
Domestic pioneer of this technology
a. The producing process of the whole facility is operating under confined state, which has good environment prevent effectiveness.
b. The design of the key equipment- split processor overcomes the disadvantage of vertical flat-bottom split processor at home, such as asymmetry heated, easy split, low yield and short life-time etc. The mainframe adopts horizontal, revolving 360o structure-1.2 R/M.
c. Safety feed-in and discharge system. The highest feed-in quantity of nlln-2200*6000is 8-10ton/day. The highest of combined equipment is 24-30ton/day.
d. Effective gas heating system. In the process of producing, when the gas was heated to 150o, it will produce a large amount of unliquefied gas-CH4--C4H8 , which can’t be formed at normal temperature, normal pressure. If those gases have been fully burning by the specific desig zzle, they can produce a great amount of energy and economize resources.
e. Fuel dust catcher system, which match with Bidirectional water impact Cyclone dust Room to ensure the discharge amount of fuel outlet meet national standa
pyrolysis equipment